NU Creek Developments Ltd. is your Spyder Hoe authority in steepness, low impact, inaccessible and confined areas, with guaranteed experience and knowledge in the following;
|
Instream Work
Fish habitat restoration through building rifles, large woody debris, rock clusters, building side channel access for rearing habitat and bank stabilization.
Click HERE for photos/projects.
Vegetative Rip Rap Installation
Protecting the infrastructure by stabilizing the riverbank using vegetative rip rap.
Click HERE for photos/projects.
High Risk Road Deactivation
Re-contouring failing forestry roads back to their original slope to prevent erosion and slope failure.
Click HERE for photos/projects.
Forestry Site Prep Work
Preparing steep hillsides for planting after they have been logged. This can be done by removing and piling fallen debris. Ie broken branches, broken tops etc for burning and mounding.
Click HERE for photos/projects. |
|
Slope Stabilization
Restoration of unstable slopes due to erosion, steep slopes, unstable ground and other adverse conditions. We can work on a 1:1 slope (or 100% slope).
Click HERE for photos/projects.
Fuel Reduction and Fire Guard
Removal of ground fuel and dead standing trees to reduce wildfire risk.
Click HERE for photos/projects.
Bridge Maintenance, Installation and Deactivation
This includes foundation protection, placing of riprap and installing bridge abutments. Even without road access, we can walk down and do the work in up to 5 ft of water. Other work has included removal of bridge foundation to return it to pre-bridge installation specs.
Click HERE for photos/projects.
Soil Sampling
Digging test holes on steep ground for soil exploration.
Ski Hill Maintenance
Installing fibre optic line, stump removal, mulching and grooming of slopes. |